Magnetoplan Personal- & Project Planner, 1215 x 915 mm. Planner for clear scheduling, project and personnel planning of an entire year (projects, seminars, conferences, trade fairs, production processes, vacations, business trips etc.) Prevents production bottlenecks + personnel underallocation. With 7-day weeks + 365-day division in half-year format. Planning capacity: For up to 35 people/projects. Magnetic adhesive, can be written on with dry wipe-off pins + can be wiped again. For exact planning and coordination: With horizontally printed monthly names (German/English) including calendar numbers (1-31) and vertically arranged line numbers. On magnetic U-profiles with ferrocard labels, names, departments or projects can be arranged vertically. With the help of writable magnetoflex bands, appointment periods can be placed + moved as required. Cost-saving: Planners for one-time purchase, can be used from year to year. With aluminum frame + modern, elegant miter corners in simple design. These comply with the current safety regulations. Supplied with 1 board marker, 1 OHP marker, 1 date magnet + mounting material.
This text is machine translated.